Home > Uncategorized > Knitting progress

Knitting progress

January 31st, 2006 Leave a comment Go to comments

Big-ass scarf, 3/4 done.

Kureyon pouch, knitted. I’m about to toss it in the washing machine to felt. I had to scavenge a little Kureyon from scraps (which fortunately matched) to finish up the i-cord drawstring, but I think if I omit one plain round in the decreases, I’ll have the perfect little 1-skein Kureyon dice bag pattern. I’ll post pics when it’s done.

Jayne hat to accompany said dice bag, knitted save for earflaps and pompom. I’ll finish that up while the bag felts, although I won’t be able to mail the package until the bag dries.

Kindergarten teacher’s bag, body is finished, still needs straps. I think I’ll add a little pocket on the side for a cell phone or whatever strikes her fancy. She wanted pink, and man, is it PINK. That’s being put on hold while I work on more hats, though.

Next up: finish big-ass scarf, then on to hats for LF, MS, MA, ML, and LC.

  1. No comments yet.
  1. No trackbacks yet.
You must be logged in to post a comment.